Working Technical Group

Working Technical Group has been formed for detailed scrutiny and endorsement of identified technologies under GEF-5 programme. Members of working technical groups(WTG) are experts from different fields. It was formed to support project steering committee to review the technologies, bussiness model and other project related activities. Details of the WTG meeting held so far is mentioned below
Working Technical Group 1 (10th October 2018)

Technology Approved

S.No. Name of Technology Cluster
1. Replacing reciprocating air compressor with Screw air compressor with permanent magnet motor with VFD Surat
2. PLC based automation system in Jet dying machine Surat
3. Installation of 100% flash steam and condensate recovery system with pressure power pump Surat
4. Replacing FBD dryer with LSU dryer in rice mills Vellore
Working Technical Group 2 (29th April 2019)

Technology Approved

S.No. Name of Technology Cluster
1. Installation Of Automation And Control System In Boiler Surat
2. Installation Of Micro-Turbine For Power Generation Surat
3. Replacement Of Steel / Aluminium Blade With FRP Blades In Withering Fan Jorhat
4. Installation of automation & control system of withering process Jorhat
5. Installation Of Energy Efficient Modulating Burner With Temperature Based Control System In Natural Gas Fired Dryer Jorhat
6. Replacement Of Conventional Lathe Machines With Special Purpose Machines BJL
7. Installation Of Energy Efficient Vacuum pump instead of old vacuum pump Muzzafarnagar
8. Installation Of Combustion Control System Varanasi
9. Replacing Existing Non- IBR Boiler With IBR Pressure Boiler Vellore
Working Technical Group 3 (18th November 2019)

Technology Approved

S.No. Name of Technology Cluster
1. Installation Of Induction Billet Heater BJL
2. Dryer Automation JOrhat
3. Divided Blast Cupola Howrah
4. Reheating furnace Automation Howrah
5. Installation Of Energy Efficient Modulating Burner With Temperature Based Control System In Natural Gas Fired Dryer Jorhat
6. High Efficiency Metallic Recuperator Howrah
7. Installation of Multi Shell VFD Sundargarh
8. Screw Compressor Sundargarh
Working Technical Group 4 (9th April and 15th April)

Technology Approved

S.No. Name of Technology Cluster
1. Installation of direct coupled agitator system with VFD Muzzafarnagar
2. Installation of Energy efficient Servo motor BJL
Working Technical Group 5 (29th June 2020)

Technology Approved

S.No. Name of Technology Cluster
1. Installation of energy efficient agitator Ankleshwar
2. Installation of energy efficient scroll chiller Ankleshwar
3. Pulverized Coal Swirl Burner Howrah
Working Technical Group 6 (1st March 2021)

Technology Approved

S.No. Name of Technology Cluster
1. Agitated nutsche filter dryer(ANFD) Ankleshwar
2. Indian Boiler regulation(IBR) Boiler Ankleshwar
3. Fitch Fuel Catalyst Ankleshwar/Howrah
4. Low Grade Heat Recovery System Varanasi
5. Automation of Cabinet and Career Dyeing Machine Varanasi
6. Automatic Tube Cleaning System Medak
7. Replacement of Steel Vacuum Pump with Electric Vacuum Pump Medak
8. Installation of Side Stream Filtration for Cooling Tower Medak
9. Installation of Mist Cooling Towers in place of Natural/Draft Cooling Tower Medak
Working Technical Group 7 (10th December 2021)

Technology Approved

S.No. Name of Technology Cluster
1. Replacing Mixers and Hot Feed Rubber Extruder with Cold Feed Extruder Aurangabad
2. Replacing Transformer based Welding Machine with Inverter (IGBT) based Welding Machine Aurangabad
3. Replacing old Technology Tyre Re-treading Line with Energy Efficient Tyre Re-treading Line Aurangabad
4. Replacing Single Spindle Drilling Machine with Semi/ Fully Automatic Multi Spindle Drilling Machine Aurangabad