Project Steering Committee consist of representatives from Ministry of MSME (MOMSME), The Bureau of energy efficiency (BEE),Energy Efficiency Services Limited(EESL),Small industries development bank of India(SIDBI),GEF focal point and other relevant bodies. PSC meeting ,chaired by MOMSME, organised twice per year to review the implementation progress ,confirm the work plan for subsequent year and provide strategic guidance to project management unit on project implementation and if required, correct the course of the project. Project steering committee(PSC) is the key decision body of the project
Project Steering Committee 4 (27th November 2018)

Technology Approved

S.No. Name of Technology Cluster
1. Replacing reciprocating air compressor with Screw air compressor with permanent magnet motor with VFD Surat
2. PLC based automation system in Jet dying machine Surat
3. Installation of 100% flash steam and condensate recovery system with pressure power pump Surat
4. Replacing FBD dryer with LSU dryer in rice mills Vellore
Project Steering Committee 5 (5th July 2019)

Technology Approved

S.No. Name of Technology Cluster
1. Installation Of Automation And Control System In Boiler Surat
2. Installation Of Micro-Turbine For Power Generation Surat
3. Replacement Of Steel / Aluminium Blade With FRP Blades In Withering Fan Jorhat
4. Installation of automation & control system of withering process Jorhat
5. Installation Of Energy Efficient Modulating Burner With Temperature Based Control System In Natural Gas Fired Dryer Jorhat
6. Replacement Of Conventional Lathe Machines With Special Purpose Machines BJL
7. Installation Of Energy Efficient Vacuum pump instead of old vacuum pump Muzzafarnagar
8. Installation Of Combustion Control System Varanasi
9. Replacing Existing Non- IBR Boiler With IBR Pressure Boiler Vellore
Project Steering Committee 6 (3rd February 2020)

Technology Approved

S.No. Name of Technology Cluster
1. Installation Of Induction Billet Heater BJL
2. Dryer Automation JOrhat
3. Divided Blast Cupola Howrah
4. Reheating furnace Automation Howrah
5. Installation Of Energy Efficient Modulating Burner With Temperature Based Control System In Natural Gas Fired Dryer Jorhat
6. High Efficiency Metallic Recuperator Howrah
7. Installation of Multi Shell VFD Sundargarh
8. Screw Compressor Sundargarh
Project Steering Committee 7 (21st July 2021)

No Technology Approved

Project Steering Committee 8 (21st September 2021)

Technology Approved

S.No. Name of Technology Cluster
1. Energy Efficient Vertical Agitator System for Reaction Vessels Ankhleshwar Chemical
2. Energy efficient scroll chiller Ankhleshwar Chemical
3. Agitated nutschefilter dryer (ANFD) Ankhleshwar Chemical
4. Fitch fuel catalyst Ankhleshwar Chemical
5. IBR Boiler Ankhleshwar Chemical
6. Swirl Burners for Pulverized Coal based Steel Re-heating Furnace Howrah
7. Servo drive and motor driven power press BJL Forging
8. Direct coupling for driving agitator system Muzafarnagar Paper Mill
9. Low-grade heat recovery system Varanasi Textile
10. Automation of cabinet and career dyeing machine Varanasi Textile
11. Online Chiller Condenser Automatic Tube Cleaning System Medak
12. Side Stream Filtration for Cooling Tower Medak
13. Mist Cooling Towers Medak
14. Replacing Steam Vaccum Pumps with Electric Dry Vaccum Pumps Medak
Project Steering Committee 9 (25th March 2022)

Technology Approved

S.No. Name of Technology Cluster
1. Replacing Mixers and Hot Feed Rubber Extruder with Cold Feed Extruder Aurangabad
2. Replacing Transformer based Welding Machine with Inverter (lGBT) based welding machine Aurangabad
3. Replacing old technology Tyre retreading Line with Energy Efficient Retreading line Aurangabad
4. Replacing Single Spindle Drilling Machine with Semi-Fully Automatic Multi Spindle Drilling Machine Aurangabad